2.4 million tonnes delivered. Zero grade substitutions.
Every project below is documented by material category, volume supplied, specification grade, and delivery window. The record speaks for the capacity.




Commercial and infrastructure scale
Downtown Chicago Mixed-Use Tower
I-70 Highway Interchange Slabs
Seattle Corporate Campus Façade
31,200 tonnes pavement-grade concrete, 6,800 tonnes structural steel. CDOT specification compliance verified per slab. On-time delivery across all 6 phases.
48,000 tonnes C40/50 structural concrete, ASTM A615 Grade 60 rebar, 12-week phased delivery window. Zero schedule variance across 22 pours.
18,400 sq m triple-glazed curtain-wall panels, U-value 0.22 W/m²K, AAMA 501.2 tested. Full batch traceability documentation supplied to specifier.
Houston Logistics Hub — Phase II
22,600 tonnes tilt-up concrete panels, ASTM C1116 fiber-reinforced grade. Load-ready inventory staged at Dallas distribution center for just-in-time site delivery.
Minneapolis River Crossing
9,400 tonnes ASTM A709 Grade 50W weathering steel, 4,200 tonnes high-performance concrete. MnDOT spec compliance certified per section.
Capacity verified by the numbers
340+
97.8%
2.4M t
0
On-time delivery rate across all project categories, measured per confirmed schedule window.
Commercial projects completed across North America in the last five years.
Total material tonnage delivered. Concrete, steel, and glass systems combined.
Grade substitutions issued. Every order ships to specification or does not ship.
